|
Product Detail :
|
EPC Contract for Design, Supply, Erection, Commissioning, Testing and Trial Run of Coal Evacuation System by Belt Conveyors and Dispatch through Rapid Loading System (RLS) with Silo at VK CHP (6 MTPA), KGM Area, including Operation and Maintenance during the five-year Defect Liability Period (DLP).
|